Major Building Renovations

The following is a selection of major building renovation projects:

The Parc Rittenhouse – Philadelphia, PA

  • Renovation of 450,000 s.f. historically-certified condominium building
  • Constructed three-story penthouse addition
  • Created a pool area atop an adjacent garage

The Triad Building – King of Prussia, PA

  • Renovation of four-story atrium and lobby
  • Installed glass-enclosed elevator
  • Installed steel and glass canopy

The Penn Mutual Building – Philadelphia, PA

  • Renovated lobby
  • Installed canopy

Bryn Mawr College, Thomas Hall, Bryn Mawr, PA

  • Façade renovation
  • Installation of new roofs
  • Removed and refurbished all metal framed lead glass windows

Vetri’s Lo Spiedo Restaurant – Philadelphia, PA

  • Complete renovation of building and façade

Independence Charter School – Philadelphia, PA

  • Construction of four-story addition
  • Installation of ADA-compliant fire, sprinkler, elevator, handicapped lift and
  • All new mechanical systems, including electrical, plumbing, voice/data, HVAC and restrooms

Building 100, Philadelphia Naval Business Center – Philadelphia, PA

  • Full building renovation, including ADA upgrades and new HVAC
  • Installation of building’s first elevator
  • Façade restoration
  • New parking lots

The Ellington Condominiums – Philadelphia, PA

  • Renovation to main lobby and club room

Goodhart Hall, Bryn Mawr College – Bryn Mawr, PA

  • Construction of addition to the Schools of Theater and Dance, which houses new lobby, teaching theater, classrooms and ancillary functions
  • Full building renovation, including stage, rigging, curtain, seating and upgrades to mechanical and life safety systems

John Fox Tower

  • Renovation of 18-story building, including upgrades to lobby and all units
  • Replacement of windows
  • Upgrades to all mechanical systems

Beneficial Savings Bank – Cherry Hill, NJ

  • Full renovation of three-story building, including new roof and storefronts, repointing and refurbishing exterior masonry,
  • Installation of new three-stop elevator
  • Fire alarm and life safety systems were upgraded

Joe First Media Center at Temple University – Philadelphia, PA

  • Construction of three-story atrium that connects School of Media and Communications to Tomlinson Theater
  • Creation of new entrance with handicapped ramp, power-activated doors and a distinctive canopy structure
  • Construction was completed in ten weeks to accommodate class schedules

Mellon Bank Center – Wilmington, DE

  • Modernization and upgrades to 18-story building in center city
  • Completed core and shell restoration, upgrades to lobby, mechanical system, and life safety systems
  • Façade waterproofing and coatings
  • Completed tenant fitouts on almost all floors

North American Building – Philadelphia, PA

  • Restored first floor lobby, including custom faux plasterwork to simulate the original marble panels that were missing in some locations
  • Replaced five elevators and installed new freight elevator
  • Installed all new windows, and mechanical, electrical and plumbing systems
  • Restored brownstone finish